The Lewisham Hospital Project was taken on as a Design and Build process, consisting of the demolition of 7 ward blocks located within the live hospital and included major asbestos surveying and removal.
There was extensive surveying and asbestos removal around live services as well as a re-insulation process, undertaken within confined spaces and extreme temperatures resulting in complex working methods and site set up being achieved.
The project also included duct strengthening works and civil engineering works - namely the installation of a new bespoke duct system, construction of a new 2 storey link and the construction of the major ground works, drainage and formation of car parks including associated M&E installations.
The project continues with the major refurbishment of a steel framed 3 storey building as a cladding and envelope lining package.
The Lewisham Hospital Design and Build package resulted in partnerships being formed with organisations such as Cyril Sweet PRC Engineering Ltd, Campbell Reith Consulting Engineers, Ansell and Bailey as well at DGT Structures.
The Gross Value of the Project currently stands at £5.6M
Delicate demolition with our Brokk robots